9962966255, 9840506778 | Catch Us On :
 
Home About UsCourses Placements Gallery Contact Us
  • Aluminium Form WorkFormwork and false work are temporary essential for the construction of cast-in-situ permanent.
    readmore
  • Suspended CeilingSK Engineering is having 40 numbers of permanent wooden Structure for taking training and testing.
    readmore
  • Plumbing Pipe FittingWe educate to understand and details interpretation in the drawings, work procedure, dimensions of fittings, installation,
    readmore
  • Electrical Pipe FittingThis trade contain Two parts in practical section. Installation of PVC Trucking & Circuit performance.
    readmore
  • Water ProofingGeneral knowledge of water proofing and application principle is thought here.
    readmore
  • Steel ReinforcementEducate to understand the drawings, Quantity of rebar, Quality of bent bars, tying of rebar, placement of components, Dimensions.
    readmore
Aluminium Form Work1 Suspended Ceiling2 Plumbing Pipe Fitting3 Electrical Pipe Fitting4 Water Proofing5 Steel Reinforcement6
Slideshow Photo by WOWSlider.com v4.0

Electrical Wiring Installation

Return to Courses

This trade contain Two parts (part1 & part2) in practical section.

  • Installation of PVC Trucking.
  • Circuit performance.

Installation of PVC Trucking

  • Nailing.
  • Cutting & jointing.
  • Termination to accessories.
  • Alignments.
  • Skill Elements.
  • Able to install PVC trucking with good nailing and correct spacing.
  • Cutting and joining must be neat and straight.
  • Abe to terminate PVC trucking to equipment & accessories with proper alignment.

Circuit Performance

 
  • Lighting circuit.
  • Power circuit.
  • Polarity

Skill Elements

  • Able to interpret single in diagram and understand the performance.
  • Able to identify the component parts and correct connections for equipments.
  • Able to select correct size of cable and correct colour codes.
  • Able to install saddle correctly.
  • Conduct must be cut squared and must not be distorted after bending.
  • Conduct must not be exposed after conducts are assembled.
  • Conduct must be terminated with bush and couplers to equipments.
  • Able to cut and bend metal trucking accurately
  • Able to install all equipment rigidly on wall / ceiling with good alignment and correct orientation.
  • Provide earthling for all metal enclosures.
  • Able to execute and install the project according to dimensions specified in drawings